Urban Development

Oliver-Valdefierro green corridor: Phase I

Location

Client
Junta de Compensación, Sector 89/3. Arcosur
Date
2005-2006 | 2006-2009
Services
Detailed design | Site supervision

The project consists of transforming an area given over to the railway line, in a corridor that forms part of the green belt of the city of Zaragoza. In the first phase, the new corridor connects the future AVE district with the districts of Miralbueno and Oliver by means of a boulevard and various regeneration actions. Different types of cross section have been developed with a width varying between 32 and 63 m.