T18_1

Teruel-Zaragoza railway section: Muel-Zaragoza

The section forms part of the Teruel – Zaragoza North West rail corridor. It is 16.30 km in length and runs through the municipalities of Mozota, Botorrita, María de Huerva and Zaragoza. The route consists of 7 km of route variation and 9.3 km of deck improvement, with a maximum proposed gradient of 15‰ and a maximum speed of 220 km/h. The project also included construction of the new Cuarte de Huerva station, adaptation of the station at María de Huerva and the halts at Botorrita and Cadrete. 

The project in pictures

T18_4
T18_5
T18_22
T18_33

01 / 04

Project location