Reservoirs and sewage at the Formigal ski resort
7 designs were drawn up for different installations at the Ski Resort. In the areas of Anayet and Portalet, designs were drawn up for the two water catchment systems for artificial snow and for two reservoirs of 59,420 m3 in Portalet and 43,951 m3. Scope includes: service area of Portalet (catchment of drinking water, tank, distribution and sewerage networks and treatment plant), service area of Anayet (tank, distribution and sanitation networks and treatment plant), Formigal housing development (drinking water catchment in the cable-car service area, distribution pipes, tank and sewerage network linked to the network, pumping station). It is also included two industrial buildings to house the elements and accessories for manufacturing artificial snow in Anayet and Portalet.
01 / 04
Project location
Related projects
Implementation of BIM methodology in state-owned dams. Lot 8
Learn more
Hydrological and hydraulic study at the MAGNA LAYDOWN site (Saudi Arabia)
Learn more